
|
IAAF Certification Gill Athletics provides equipment for international competition. Any fixture or implement used in a sanctioned International Association Athletic Federation (IAAF) event must be certified by the IAAF. All certified Gill implements and fixtures will bear this insignia with it. All affected product certifications are updated annually if and when the IAAF modifies regulations. |

|
Equipment Installation Notice All installations should be done by experienced contractors and in accordance with all applicable codes, laws and regulations. Suggested installation instructions herein are illustrative only and should be adapted to suit local requirements. Gill Athletics is not responsible for the manner in which these products are installed. |
|
Facility Planning CD Includes: Most of our latest scale drawings in AutoCAD 2002 format for use in planning facilities. Product specifications and material needed to complete installation and recommended installation procedures. It also includes, recommended facility layouts and internet links to track and field governing body code specifications. System Requirements : AutoCAD 2002 runs on microprocessor based machines running Windows NT with SP 5.0, Windows 98, Windows Millennium Edition, and Windows 2000. AutoCAD 2002 typically requires a machine with a Pentium 233 Processor and at least 32MB RAM. A Pentium 450MHz machine with 65MB RAM, a 1024 x 768 display, and CD ROM drive is recommended. Sufficient disc space is also required to handle installation of AutoCAD 2002 plus any data/drawing files saved. More memory of faster processors will directly improve performance and capacity. |
|
General Info |


|
T r a c k and F i e l d F a c i l i t y P l a n n i n g C D |
|
a complete guide to athletic facilities equipment |